Smuuli
Bridge
|
| Location |
Estonia |
|
| Client |
Merko, 3Bau |
| Date |
12/2005 - 02/2006 |
| Services |
Structural analysis, pre-stressing design,
optimisation of cable-stressing sequence, design checks according
to Eurocode. |
| Description |
|
|
This bridge is a three-span extradosed
bridge (42+85+42m) made from post-tensioned concrete. Upon completion
the Smuuli Bridge will be the first cable-stayed bridge in Estonia.
The approach viaduct consists of three spans on each side which
are constructed from pre-cast beams with a cast in-situ deck.
Each pier is supported by pile foundations. The bridge crosses
an active railway line calling for cantilevering as the construction
method of choice. The approach viaducts were constructed first
and counterbalance the two free cantilevers of the extradosed
section of the bridge. The optimisation of the cable-stressing
sequence was one of the more interesting issues during this work
since the cross-section of the main girder is rather slender.
Modelling tasks for this bridge also included the longitudinal
and transversal PT, time-dependent effects and a detailed definition
of the construction sequence. |


System view, moments due to traffic loading,
associated stresses top and bottom.
|
|
Construction stage simulation |

|

|
 |
|

|
|