Donausteg Linz  Habicht n°4 Skywalk Waltrafelsen  Flowtec  Natex.Head  Donausteg Linz  Haus Schmidt  Haus Schmidt

PORTFOLIO | Bridges - Buildings - Special Structures - Competitions

ABESINT members:
IL | PT | AT | OZ | VN

 

 

 

ABOUT US

SERVICES

CHRONOLOGY

PORTFOLIO

LINKS

 

|

 

Hesperbachtal Bridge

Location Germany
Hesperbachtal Bridge
Client EHS Beratende Ingenieure, Kassel
Date 2006
Services Structural Analysis
Description    
The present 6-span box girder bridge with a total length of 232m and a curved alignment was designed according to the German regulations of the DIN Fachbericht 105. A span-by-span erection sequence facilitated by a gantry was chosen requiring a detailed simulation of the construction process. The cross-section with a width of 15.5m contains exclusively external pre-stressing.

Hesperbachtal Bridge
External pre-stressing



Hesperbachtal Bridge Cross-section with pre-stressing deviator
Hesperbachtal Bridge

Stress distribution in external pre-stressing tendon

 

 
Tel Aviv | Lisbon | Graz | Sydney | Hanoi